Installation of LMP in Baku, Azerbaijan.

Customer: Halliburton Company in support of SOCAR, Republic of Azerbaijan, Baku, Caspian Sea coast, 16th kilometer of Salyan highway.

Construction of a liquid mud plant on water and hydrocarbon basis in the period September-November 2016 was the first stage of the drilling of wells in the Caspian Sea by SOCAR (Republic of Azerbaijan).

Scope of Work: Supply of materials, installation of equipment and process pipelines, construction of a prefabricated building industrial building, hydrotesting of pipelines, commissioning.

Capacity of the tank farm is 10 000 bbl.

In this project, RIKS PCS acted as a general contractor for the execution of construction and installation works and a supplier of materials and equipment.

The project has been fulfilled on schedule and put into operation.